Is it necessary to import my build in order to use the post-build reports? I have a successful build, but when I try to print the master schedule to analyze it or use any of the reports, nothing happens?
Also, can someone tell me what percentage should I be happy with as far as students loaded after a build?
Thank you!
Yes, you must Import the Build. I would ignore the "Students Loaded" % as the Build and Load process are separate. You also need to Import the Load after you run it as well.