Post-Build Question

DiamondGem
Padawan

Post-Build Question

Is it necessary to import my  build in order to use the post-build reports?  I have a successful build, but when I try to print the master schedule to analyze it or use any of the reports, nothing happens?

 

Also, can someone tell me what percentage should I be happy with as far as students loaded after a build?

 

Thank you!

1 Reply
JeffG9
PowerSchool Champion
PowerSchool Champion

Yes, you must Import the Build. I would ignore the "Students Loaded" % as the Build and Load process are separate. You also need to Import the Load after you run it as well.

______________
Full Disclosure: I do not work for PowerSchool